Bloomington East

Campground · Kansas · 305 bookable sites ·

Managed by the US Army Corps of Engineers

Clinton Recreation Area (Recreation Area) · Open Access

305
Bookable sites
100 ft
Max rig length
up to 75
People per site
17
Accessible sites
912 ft
Elevation
Bloomington East Park
Photo: USACE · Recreation.gov

Overview

Bloomington East Park includes Cedar Ridge, Hickory/Walnut, and Oak Campgrounds, Ash and Elm Group Camps, and Bloomington Beach Picnic Shelters. The park is located just west of Clinton Lake, between the Rock Creek and Wakarusa River arms of the lake, and offers several different recreational options. Within Bloomington East Park, visitors have the opportunity to reserve picnic shelters and campsites, both for group camping and individual family camping.

Recreation

Bloomington Beach has a large sandy beach for swimming. Bloomington Beach requires a day use fee, for non-campers, between May 1 and September 30.

Bloomington East offers 4 sets of boat ramps with courtesy docks. Launching a Boat requires a day use fee, for non-campers, between April 1 and November 30. 

Bloomington East offers over 300 campsites ranging from primitive to full hook-up to group camps 

4 group shelters and dozens of picnic tables throughout the park make Bloomington East the perfect spot for vistitors just wanting to visit or the day.


There are horseshoe pits, sand volleyball courts and playgrounds located several places in Bloomington East Park, making it the perfect spot for families. 

A full 18-hole professional disc golf course is also available free to all visitors (sets of disc can be borrowed from the camp host stations).


Clinton Lake offers opportunities for boating, fishing, canoeing, jet skiing, swimming and countless other water sports, making it the main attraction in Bloomington East Park.


The lake's fish and wildlife resources provide sightseers, fishermen, and hunters, ample opportunities for their sports, and Clinton Lake is well-stocked with crappie, walleye, channel catfish and white bass. Bloomington East Park has three boat ramps within a short driving distance of the campgrounds. These boat ramps (#5, 6 and 7) do require a day use fee, for non-campers, between April 1 and October 31.


Visitors enjoy viewing bald eagles, white-tailed deer, Canada geese, wild turkey and other wildlife in abundance at Clinton Lake.


Bloomington East offers the Smokehouse Trail, while three other trail systems are located around Clinton Lake, including the North Shore, South Shore and the George Latham Trails. All offer hiking, biking and equestrian opportunities within a 20 minute drive.

Facilities

The Bloomington Beach Day Use area has four picnic shelters. This spacious day use picnic area is located adjacent to Bloomington Beach providing an ideal location for large group or family gatherings. The picnic shelters are reservable, for a fee, or free to use on a first-come, first-serve basis, if not already reserved, and have electrical outlets. There are several single picnic tables for use by smaller groups.

Cedar Ridge and Hickory Walnut Campgrounds are the two main campgrounds, comprised of individual family sites. Many of these campsites have electrical or electrical and water hookups. Somewhat removed from the larger Hickory Walnut Campground, are Oak Campground, Elm Group Camp and Ash Group Camp. Oak Campground is a loop of Hickory Walnut Campground, with individual family campsites. Elm Group Camp and Ash Group Camp are larger, grassy areas, available for reservation, by larger groups, accommodating up to 75 people. Elm and Ash Group Camps are intended for tent camping groups, but can handle a limited number of small trailers, such as tent campers, as long as they remain on the gravel circle drive. There is no electricity provided in Elm or Ash Group Camps.

Cedar Ridge, Hickory Walnut and Bloomington Beach Day Use area provide amenities like flush toilets, drinking water, showers and a nearby dump station for a comfortable camping experience. There is a covered, accessible fishing dock a short drive or walk from the campgrounds and picnic shelters.

Natural Features

Congress authorized Clinton Lake in 1962, and the finished reservoir was filled in 1980. While the Dam and Reservoir were originally built for flood control, the area has now become a recreational oasis for millions of visitors to enjoy the beautiful green Kansas backdrop.

Clinton Lake's beautiful setting of steep bluffs, wooded shoreline and clean water is unequaled among Kansas lakes. Shoreline development has been limited in an effort to preserve as much of the natural setting as possible.

Clinton Lake spans 8 miles up the Wakarusa Valley and covers 7,000 surface acres. If the lake ever approaches the top of its flood pool, an additional 5,800 acres will be covered, extending the area to 13 miles along the valley floor.

Nearby Attractions

The Visitor Center, located on the northwest side of the dam, has several informative displays covering topics such as the history of the area, reasons for the dam and the wildlife in the area.

The Clinton Lake Museum, located within Bloomington East Park, has several informative displays covering topics like the history of the region and the Underground Railroad.

The cities of Lawrence and Topeka are within a 30 minute drive.

Charges & Cancellations

The facts

  • 305 bookable sites
  • 323 sites in total, including non-bookable
  • 17 accessible sites
  • Vehicles up to 100 ft
  • Up to 75 people per site
  • Loops: ASH GROUP CAMPGROUND, CEDAR RIDGE CAMPGROUND, ELM GROUP CAMPGROUND, HICKORY CAMPGROUND, OAK CAMPGROUND, WALNUT CAMPGROUND

Site types

  • 184 Standard Electric
  • 119 Standard Nonelectric
  • 18 Management
  • 2 Group Standard Nonelectric

Amenities

  • Electric hookups
  • Water hookups
  • Sewer hookups
  • Campfires allowed
  • Fire pits
  • Picnic tables
  • Grills
  • Shade
  • Pets allowed

Book on Recreation.gov

323 campsites at Bloomington East

SiteLoopTypeEntrySurfaceWaterMax rigPeople
ASH GROUPASH GROUP CAMPGROUNDGroup Standard NonelectricPull ThroughGravel—60 ft75 🐾
001CEDAR RIDGE CAMPGROUNDManagementBack InGravel—60 ft8 🐾
002CEDAR RIDGE CAMPGROUNDManagementBack InGravel—60 ft8 🐾
003CEDAR RIDGE CAMPGROUNDStandard ElectricBack InPaved—60 ft8 🐾
004CEDAR RIDGE CAMPGROUNDStandard ElectricBack InPaved—60 ft8 🐾
005CEDAR RIDGE CAMPGROUNDStandard ElectricBack InPaved—60 ft8 🐾
006CEDAR RIDGE CAMPGROUNDStandard ElectricBack InPaved—60 ft8 🐾
007CEDAR RIDGE CAMPGROUNDStandard ElectricPull ThroughPaved—60 ft8 🐾
008CEDAR RIDGE CAMPGROUNDStandard ElectricPull ThroughPaved—60 ft8 🐾
009CEDAR RIDGE CAMPGROUNDStandard ElectricPull ThroughPaved—60 ft8 🐾
010CEDAR RIDGE CAMPGROUNDStandard ElectricPull ThroughPaved—60 ft8 🐾
011CEDAR RIDGE CAMPGROUNDStandard ElectricPull ThroughPaved—60 ft8 🐾
012CEDAR RIDGE CAMPGROUNDStandard ElectricPull ThroughPaved—60 ft8 🐾
013CEDAR RIDGE CAMPGROUNDStandard ElectricPull ThroughPaved—60 ft8 🐾
014CEDAR RIDGE CAMPGROUNDStandard ElectricPull ThroughPaved—60 ft8 🐾
015CEDAR RIDGE CAMPGROUNDStandard ElectricPull ThroughPaved—60 ft8 🐾
016CEDAR RIDGE CAMPGROUNDStandard ElectricPull ThroughPaved—60 ft8 🐾
017CEDAR RIDGE CAMPGROUNDStandard ElectricPull ThroughPaved—60 ft8 🐾
018CEDAR RIDGE CAMPGROUNDStandard ElectricPull ThroughPaved—60 ft8 🐾
019CEDAR RIDGE CAMPGROUNDStandard ElectricPull ThroughPaved—60 ft8♿ 🐾
020CEDAR RIDGE CAMPGROUNDStandard ElectricPull ThroughPaved—60 ft8 🐾
021CEDAR RIDGE CAMPGROUNDStandard ElectricPull ThroughPaved—60 ft8 🐾
022CEDAR RIDGE CAMPGROUNDStandard ElectricPull ThroughPaved—60 ft8 🐾
023CEDAR RIDGE CAMPGROUNDStandard ElectricPull ThroughPaved—60 ft8♿ 🐾
024CEDAR RIDGE CAMPGROUNDStandard ElectricPull ThroughPaved—60 ft8 🐾
025CEDAR RIDGE CAMPGROUNDStandard ElectricPull ThroughPaved—60 ft8 🐾
026CEDAR RIDGE CAMPGROUNDStandard ElectricPull ThroughPaved—60 ft8 🐾
027CEDAR RIDGE CAMPGROUNDStandard ElectricPull ThroughPaved—60 ft8 🐾
028CEDAR RIDGE CAMPGROUNDStandard ElectricPull ThroughPaved—60 ft8 🐾
029CEDAR RIDGE CAMPGROUNDStandard ElectricPull ThroughPaved—60 ft8 🐾
030CEDAR RIDGE CAMPGROUNDStandard ElectricPull ThroughPaved—60 ft8 🐾
031CEDAR RIDGE CAMPGROUNDStandard ElectricPull ThroughPaved—60 ft8 🐾
032CEDAR RIDGE CAMPGROUNDStandard ElectricBack InPaved—60 ft8 🐾
033CEDAR RIDGE CAMPGROUNDStandard ElectricBack InPaved—60 ft8 🐾
034CEDAR RIDGE CAMPGROUNDStandard ElectricBack InPaved—60 ft8 🐾
035CEDAR RIDGE CAMPGROUNDStandard ElectricBack InPaved—60 ft8 🐾
036CEDAR RIDGE CAMPGROUNDStandard ElectricBack InPaved—60 ft8 🐾
037CEDAR RIDGE CAMPGROUNDStandard ElectricBack InPaved—60 ft8 🐾
038CEDAR RIDGE CAMPGROUNDStandard ElectricBack InPaved—60 ft8 🐾
039CEDAR RIDGE CAMPGROUNDStandard ElectricBack InPaved—60 ft8 🐾
040CEDAR RIDGE CAMPGROUNDStandard ElectricBack InPaved—60 ft8 🐾
041CEDAR RIDGE CAMPGROUNDStandard ElectricBack InPaved—60 ft8 🐾
042CEDAR RIDGE CAMPGROUNDStandard ElectricBack InPaved—60 ft8 🐾
043CEDAR RIDGE CAMPGROUNDStandard ElectricBack InPaved—60 ft8 🐾
044CEDAR RIDGE CAMPGROUNDStandard ElectricBack InPaved—60 ft8 🐾
045CEDAR RIDGE CAMPGROUNDStandard ElectricBack InPaved—60 ft8 🐾
046CEDAR RIDGE CAMPGROUNDStandard ElectricBack InPaved—60 ft8 🐾
047CEDAR RIDGE CAMPGROUNDStandard ElectricBack InPaved—60 ft8 🐾
048CEDAR RIDGE CAMPGROUNDStandard ElectricBack InPaved—60 ft8 🐾
049CEDAR RIDGE CAMPGROUNDStandard ElectricBack InPaved—60 ft8 🐾
050CEDAR RIDGE CAMPGROUNDStandard ElectricBack InPaved—60 ft8 🐾
051CEDAR RIDGE CAMPGROUNDStandard ElectricBack InPaved—60 ft8 🐾
052CEDAR RIDGE CAMPGROUNDStandard ElectricBack InPaved—60 ft8 🐾
053CEDAR RIDGE CAMPGROUNDStandard ElectricBack InPaved—60 ft8 🐾
054CEDAR RIDGE CAMPGROUNDStandard ElectricBack InPaved—60 ft8 🐾
055CEDAR RIDGE CAMPGROUNDStandard ElectricBack InPaved—60 ft8 🐾
056CEDAR RIDGE CAMPGROUNDStandard ElectricBack InPaved—60 ft8 🐾
057CEDAR RIDGE CAMPGROUNDStandard ElectricBack InPaved—60 ft8 🐾
058CEDAR RIDGE CAMPGROUNDStandard ElectricBack InPaved—60 ft8 🐾
059CEDAR RIDGE CAMPGROUNDStandard ElectricBack InPaved—60 ft8 🐾
060CEDAR RIDGE CAMPGROUNDManagementBack InGravel—60 ft8 🐾
061CEDAR RIDGE CAMPGROUNDManagementBack InGravel—60 ft8 🐾
062CEDAR RIDGE CAMPGROUNDStandard ElectricBack InPaved—60 ft8 🐾
063CEDAR RIDGE CAMPGROUNDStandard ElectricBack InPaved—60 ft8 🐾
064CEDAR RIDGE CAMPGROUNDStandard ElectricBack InPaved—60 ft8 🐾
065CEDAR RIDGE CAMPGROUNDStandard ElectricBack InPaved—60 ft8 🐾
066CEDAR RIDGE CAMPGROUNDStandard ElectricPull ThroughPaved—60 ft8 🐾
067CEDAR RIDGE CAMPGROUNDStandard ElectricPull ThroughPaved—60 ft8 🐾
068CEDAR RIDGE CAMPGROUNDStandard ElectricPull ThroughPaved—60 ft8 🐾
069CEDAR RIDGE CAMPGROUNDStandard ElectricPull ThroughPaved—60 ft8 🐾
070CEDAR RIDGE CAMPGROUNDStandard ElectricPull ThroughPaved—60 ft8♿ 🐾
071CEDAR RIDGE CAMPGROUNDStandard ElectricPull ThroughPaved—60 ft8 🐾
072CEDAR RIDGE CAMPGROUNDStandard ElectricPull ThroughPaved—60 ft8 🐾
073CEDAR RIDGE CAMPGROUNDStandard ElectricPull ThroughPaved—60 ft8 🐾
074CEDAR RIDGE CAMPGROUNDStandard ElectricPull ThroughPaved—60 ft8 🐾
075CEDAR RIDGE CAMPGROUNDStandard ElectricPull ThroughPaved—60 ft8 🐾
076CEDAR RIDGE CAMPGROUNDStandard ElectricPull ThroughPaved—60 ft8 🐾
077CEDAR RIDGE CAMPGROUNDStandard ElectricPull ThroughPaved—60 ft8 🐾
078CEDAR RIDGE CAMPGROUNDStandard ElectricPull ThroughPaved—60 ft8 🐾
079CEDAR RIDGE CAMPGROUNDStandard ElectricPull ThroughPaved—60 ft8♿ 🐾
080CEDAR RIDGE CAMPGROUNDStandard ElectricPull ThroughPaved—60 ft8♿ 🐾
081CEDAR RIDGE CAMPGROUNDStandard ElectricPull ThroughPaved—60 ft8 🐾
082CEDAR RIDGE CAMPGROUNDStandard ElectricPull ThroughPaved—60 ft8 🐾
083CEDAR RIDGE CAMPGROUNDStandard ElectricPull ThroughPaved—60 ft8 🐾
084CEDAR RIDGE CAMPGROUNDStandard ElectricPull ThroughPaved—60 ft8 🐾
085CEDAR RIDGE CAMPGROUNDStandard ElectricPull ThroughPaved—60 ft8 🐾
086CEDAR RIDGE CAMPGROUNDStandard ElectricPull ThroughPaved—60 ft8 🐾
087CEDAR RIDGE CAMPGROUNDStandard ElectricPull ThroughPaved—60 ft8 🐾
088CEDAR RIDGE CAMPGROUNDStandard ElectricPull ThroughPaved—60 ft8 🐾
089CEDAR RIDGE CAMPGROUNDStandard ElectricPull ThroughPaved—60 ft8 🐾
090CEDAR RIDGE CAMPGROUNDStandard ElectricPull ThroughPaved—60 ft8 🐾
091CEDAR RIDGE CAMPGROUNDStandard ElectricPull ThroughPaved—60 ft8 🐾
092CEDAR RIDGE CAMPGROUNDStandard ElectricPull ThroughPaved—60 ft8 🐾
093CEDAR RIDGE CAMPGROUNDStandard ElectricPull ThroughPaved—60 ft8 🐾
094CEDAR RIDGE CAMPGROUNDStandard ElectricPull ThroughPaved—60 ft8♿ 🐾
095CEDAR RIDGE CAMPGROUNDStandard ElectricPull ThroughPaved—60 ft8 🐾
096CEDAR RIDGE CAMPGROUNDStandard ElectricPull ThroughPaved—60 ft8 🐾
097CEDAR RIDGE CAMPGROUNDStandard ElectricPull ThroughPaved—60 ft8 🐾
098CEDAR RIDGE CAMPGROUNDStandard ElectricPull ThroughPaved—60 ft8 🐾
099CEDAR RIDGE CAMPGROUNDStandard ElectricPull ThroughPaved—60 ft8 🐾
100CEDAR RIDGE CAMPGROUNDStandard ElectricBack InPaved—60 ft8 🐾
101CEDAR RIDGE CAMPGROUNDStandard ElectricBack InPaved—60 ft8♿ 🐾
ELM GROUPELM GROUP CAMPGROUNDGroup Standard NonelectricPull ThroughGravel—60 ft75 🐾
102HICKORY CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
103HICKORY CAMPGROUNDStandard NonelectricBack InGravel—60 ft8♿ 🐾
104HICKORY CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
105HICKORY CAMPGROUNDStandard NonelectricBack InGravel—60 ft8♿ 🐾
106HICKORY CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
107HICKORY CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
108HICKORY CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
109HICKORY CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
110HICKORY CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
111HICKORY CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
112HICKORY CAMPGROUNDStandard NonelectricBack InGravelLakefront20 ft8 🐾
113HICKORY CAMPGROUNDStandard NonelectricBack InGravelLakefront60 ft8 🐾
114HICKORY CAMPGROUNDStandard NonelectricBack InGravelLakefront60 ft8 🐾
115HICKORY CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
116HICKORY CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
117HICKORY CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
118HICKORY CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
119HICKORY CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
120HICKORY CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
121HICKORY CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
122HICKORY CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
123HICKORY CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
124HICKORY CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
125HICKORY CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
126HICKORY CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
127HICKORY CAMPGROUNDStandard NonelectricBack InGravel—60 ft8♿ 🐾
128HICKORY CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
129HICKORY CAMPGROUNDStandard NonelectricBack InGravel—60 ft8♿ 🐾
130HICKORY CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
131HICKORY CAMPGROUNDStandard NonelectricBack InGravel—60 ft8♿ 🐾
132HICKORY CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
133HICKORY CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
134HICKORY CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
135HICKORY CAMPGROUNDStandard NonelectricBack InGravelLakefront60 ft8 🐾
136HICKORY CAMPGROUNDStandard NonelectricPull ThroughGravelLakefront100 ft8 🐾
137HICKORY CAMPGROUNDStandard NonelectricPull ThroughGravelLakefront100 ft8 🐾
138HICKORY CAMPGROUNDStandard NonelectricBack InGravelLakefront60 ft8 🐾
139HICKORY CAMPGROUNDStandard NonelectricBack InGravelLakefront60 ft8 🐾
140HICKORY CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
141HICKORY CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
142HICKORY CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
143HICKORY CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
144HICKORY CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
145HICKORY CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
146HICKORY CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
147HICKORY CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
148HICKORY CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
149HICKORY CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
150HICKORY CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
151HICKORY CAMPGROUNDStandard ElectricPull ThroughGravel—100 ft8 🐾
152HICKORY CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
153HICKORY CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
154HICKORY CAMPGROUNDStandard ElectricPull ThroughGravel—100 ft8 🐾
155HICKORY CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
156HICKORY CAMPGROUNDStandard ElectricPull ThroughGravel—100 ft8 🐾
157HICKORY CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
158HICKORY CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
159HICKORY CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
160HICKORY CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
161HICKORY CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
162HICKORY CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
163HICKORY CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
164HICKORY CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
165HICKORY CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
166HICKORY CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
167HICKORY CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
168HICKORY CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
169HICKORY CAMPGROUNDManagementBack InGravel—60 ft8 🐾
170HICKORY CAMPGROUNDManagementBack InGravel—60 ft8 🐾
171HICKORY CAMPGROUNDManagementBack InGravel—60 ft8 🐾
172HICKORY CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
173HICKORY CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
174HICKORY CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
175HICKORY CAMPGROUNDStandard ElectricBack InGravel—60 ft8♿ 🐾
176HICKORY CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
177HICKORY CAMPGROUNDStandard ElectricBack InGravel—60 ft8♿ 🐾
178HICKORY CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
179HICKORY CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
180HICKORY CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
181HICKORY CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
182HICKORY CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
183HICKORY CAMPGROUNDManagementBack InGravel—60 ft8 🐾
184HICKORY CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
185HICKORY CAMPGROUNDManagementBack InGravel—60 ft8 🐾
186HICKORY CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
187HICKORY CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
188HICKORY CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
189HICKORY CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
190HICKORY CAMPGROUNDStandard ElectricBack InGravel—60 ft8♿ 🐾
191HICKORY CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
192HICKORY CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
193HICKORY CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
194HICKORY CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
195HICKORY CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
196HICKORY CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
197HICKORY CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
198HICKORY CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
199HICKORY CAMPGROUNDStandard ElectricBack InGravel—60 ft8♿ 🐾
200HICKORY CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
201HICKORY CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
202HICKORY CAMPGROUNDStandard ElectricBack InGravel—60 ft8♿ 🐾
300OAK CAMPGROUNDStandard NonelectricBack InGravel—58 ft8 🐾
301OAK CAMPGROUNDStandard NonelectricBack InGravel—52 ft8 🐾
302OAK CAMPGROUNDStandard NonelectricBack InGravel—57 ft8 🐾
303OAK CAMPGROUNDStandard NonelectricPull ThroughGravel—60 ft8 🐾
304OAK CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
305OAK CAMPGROUNDStandard NonelectricBack InGravel—58 ft8 🐾
306OAK CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
307OAK CAMPGROUNDStandard NonelectricBack InGravel—55 ft8 🐾
308OAK CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
309OAK CAMPGROUNDStandard NonelectricBack InGravel—56 ft8 🐾
310OAK CAMPGROUNDStandard NonelectricBack InGravel—56 ft8 🐾
311OAK CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
312OAK CAMPGROUNDStandard NonelectricBack InGravel—58 ft8 🐾
313OAK CAMPGROUNDStandard NonelectricBack InGravel—50 ft8 🐾
314OAK CAMPGROUNDStandard NonelectricBack InGravel—57 ft8 🐾
315OAK CAMPGROUNDStandard NonelectricBack InGravel—55 ft8 🐾
316OAK CAMPGROUNDStandard NonelectricBack InGravel—45 ft8 🐾
317OAK CAMPGROUNDStandard NonelectricBack InGravel—55 ft8 🐾
318OAK CAMPGROUNDStandard NonelectricPull ThroughGravel—60 ft8 🐾
319OAK CAMPGROUNDStandard NonelectricPull ThroughGravel—60 ft8 🐾
320OAK CAMPGROUNDStandard NonelectricPull ThroughGravel—60 ft8 🐾
321OAK CAMPGROUNDStandard NonelectricPull ThroughGravel—60 ft8 🐾
203WALNUT CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
204WALNUT CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
205WALNUT CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
206WALNUT CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
207WALNUT CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
208WALNUT CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
209WALNUT CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
210WALNUT CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
211WALNUT CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
212WALNUT CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
213WALNUT CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
214WALNUT CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
215WALNUT CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
216WALNUT CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
217WALNUT CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
218WALNUT CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
219WALNUT CAMPGROUNDStandard NonelectricBack InGravelLakefront60 ft8 🐾
220WALNUT CAMPGROUNDStandard NonelectricBack InGravelLakefront60 ft8 🐾
221WALNUT CAMPGROUNDStandard NonelectricPull ThroughGravelLakefront60 ft8 🐾
222WALNUT CAMPGROUNDStandard NonelectricPull ThroughGravelLakefront60 ft8 🐾
223WALNUT CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
224WALNUT CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
225WALNUT CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
226WALNUT CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
227WALNUT CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
228WALNUT CAMPGROUNDManagementBack InGravel—60 ft8 🐾
229WALNUT CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
230WALNUT CAMPGROUNDManagementBack InGravel—60 ft8 🐾
231WALNUT CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
232WALNUT CAMPGROUNDManagementBack InGravel—60 ft8 🐾
233WALNUT CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
234WALNUT CAMPGROUNDManagementBack InGravel—60 ft8 🐾
235WALNUT CAMPGROUNDManagementBack InGravel—60 ft8 🐾
236WALNUT CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
237WALNUT CAMPGROUNDManagementBack InGravel—60 ft8 🐾
238WALNUT CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
239WALNUT CAMPGROUNDManagementBack InGravel—60 ft8 🐾
240WALNUT CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
241WALNUT CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
242WALNUT CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
243WALNUT CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
244WALNUT CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
245WALNUT CAMPGROUNDStandard NonelectricPull ThroughGravelLakefront60 ft8 🐾
246WALNUT CAMPGROUNDStandard NonelectricPull ThroughGravelLakefront60 ft8 🐾
247WALNUT CAMPGROUNDStandard NonelectricPull ThroughGravelLakefront60 ft8 🐾
248WALNUT CAMPGROUNDStandard NonelectricBack InGravelLakefront60 ft8 🐾
249WALNUT CAMPGROUNDStandard NonelectricBack InGravelLakefront60 ft8 🐾
250WALNUT CAMPGROUNDStandard NonelectricBack InGravelLakefront60 ft8 🐾
251WALNUT CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
252WALNUT CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
253WALNUT CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
254WALNUT CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
255WALNUT CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
256WALNUT CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
257WALNUT CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
258WALNUT CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
259WALNUT CAMPGROUNDStandard NonelectricBack InGravel—60 ft8 🐾
260WALNUT CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
261WALNUT CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
262WALNUT CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
263WALNUT CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
264WALNUT CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
265WALNUT CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
266WALNUT CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
267WALNUT CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
268WALNUT CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
269WALNUT CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
270WALNUT CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
271WALNUT CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
272WALNUT CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
273WALNUT CAMPGROUNDManagementBack InGravel—60 ft8 🐾
274WALNUT CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
275WALNUT CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
276WALNUT CAMPGROUNDManagementBack InGravel—60 ft8 🐾
277WALNUT CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
278WALNUT CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
279WALNUT CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
280WALNUT CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
281WALNUT CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
282WALNUT CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
283WALNUT CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
284WALNUT CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
285WALNUT CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
286WALNUT CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
287WALNUT CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
288WALNUT CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
289WALNUT CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
290WALNUT CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
291WALNUT CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
292WALNUT CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
293WALNUT CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
294WALNUT CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
295WALNUT CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
296WALNUT CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
297WALNUT CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
298WALNUT CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾
299WALNUT CAMPGROUNDStandard ElectricBack InGravel—60 ft8 🐾

Getting there

From Lawrence, Kansas, take 6th Street west for 4 miles. Take a left onto County Road 442 and continue 5 miles to Stull, Kansas. Make a left turn onto County Road 1023 and continue about 6 miles to County Road 6, make a left turn, and go 4 miles through the town of Clinton. Follow directional signs to the park.

38.90790, -95.37526 · 38°54'28.4"N 95°22'30.9"W

Directions (Google Maps) · Directions (Apple Maps)

Typical weather

Typically 88°F in Jul, down to 38°F in Jan.

JanFebMarAprMayJunJulAugSepOctNovDec
High °F384455657483888779675342
Low °F182333435464686657453323
Precip in0.81.32.03.95.05.53.84.64.03.31.91.5

1991–2020 averages from the nearest NOAA station, 3 mi away — not measured at the facility itself, and elevation can make a real difference over that distance.

Map

More photos

Member photos

Common questions about Bloomington East

Can you reserve a site at Bloomington East?
Yes, Bloomington East is reservable through Recreation.gov.
How many campsites does Bloomington East have?
323 sites in total, of which 305 can be booked.
What is the maximum RV length at Bloomington East?
100 ft. That is the longest vehicle the sites here are recorded as taking; individual sites may be shorter.
Are pets allowed at Bloomington East?
Yes, pets are allowed at Bloomington East.
Does Bloomington East have hookups?
Electric, Water, Sewer.
Are campfires allowed at Bloomington East?
Campfires are allowed at Bloomington East. Check for a current fire restriction before you go.

Camping near Bloomington East

Comments

Contact

Recreation.gov last updated this record on 2026-03-11.

Facility information and photographs from Recreation.gov (RIDB). SpotOpened is not affiliated with Recreation.gov or any federal agency.