Strawberry Bay

Campground · Utah · 232 bookable sites ·

Managed by the USDA Forest Service

Uintah and Ouray Reservation (D8)

232
Bookable sites
104 ft
Max rig length
up to 100
People per site
7,643 ft
Elevation
Strawberry Bay
Photo: Utah Recreation Company · Recreation.gov

Overview

Strawberry Bay Campground is located on the shore of beautiful Strawberry Reservoir at an elevation of 7,200 feet. Visitors flock to Strawberry for its great fishing, boating and trail opportunities.

Recreation

Strawberry Reservoir offers excellent boating, water skiing and canoeing. Anglers fish for rainbow trout, cutthroat trout and Kokanee salmon. The campground provides great beach access.

Strawberry Marina is within 1/4 mile and offers a boat ramp, power and pontoon boat rentals, slip rentals, fuel and a small general store with fishing supplies.

Other popular activities in the Strawberry area include hiking, biking and horseback riding.

Facilities

This large campground contains a variety of campsites to accommodate all types of visitors, including group, family and single campsites. Several sites, B loop, have full RV hookups.

Flush toilets and drinking water are provided. Most sites are equipped with either wind shelters and/or covered picnic shelters, tables, grills and campfire rings. Firewood is available for purchase from the host. There are no shower facilities at this campground.

Natural Features

The campground is set among rolling sagebrush covered hills next to Strawberry Reservoir. Most campsites offer sweeping views of the reservoir and surrounding hills. Small pine trees dot the campground but provide very little shade.

Contact Info

For facility specific information, please call (385) 273-1100.

Nearby Attractions

The Strawberry OHV Trail System offers 75 miles of trails. Hikers and mountain bikers enjoy the extensive trail system as well.

Strawberry Visitor Center has interpretive displays, a working fish trap and egg collection station and a nature trail.

Charges & Cancellations

Change and Cancellation Policies and Fees

  • Overnight and Day Use Facilities: To ensure fairness, reservation arrival or departure dates may not be changed beyond the booking window until 18 days after booking the reservation.
  • Camping / Day Use: A $10.00 service fee will apply if you change or cancel your reservation (including campsites, cabins, lookouts, group facilities, etc.). The $10.00 service fee will be deducted from the refund amount.
  • You can cancel or change reservations through Recreation.gov or by calling 1-877-444-6777.

Late Cancellations

  • Overnight and Day Use Facilities: Late cancellations are those cancelled between 12:01 a.m. (Eastern) on the day before arrival and check out time on the day after arrival.
  • Individual Campsites: If a customer cancels a reservation the day before or on the day of arrival they will be charged a $10.00 service fee and will also forfeit the first night's use fee (not to exceed the total paid for the original reservation). Cancellations for a single night's reservation will forfeit the entire use fee but no cancellation fee will apply.
  • Cabins / Lookouts: Customers will be charged a $10.00 cancellation fee and forfeit the first night's use fee if a cabin or lookout reservation is cancelled within 14 days of the scheduled arrival date. Cancellations for a single night's use will not be assessed a service fee.
  • Group Facility: If a customer cancels a group overnight facility reservation within 14 days of the scheduled arrival date they will be charged the $10.00 service fee and forfeit the first night's use fee. Cancellations for a single night's use will not be assessed a service fee.
  • Group Day Use Area: If a customer cancels a group day use facility reservation within 14 days of the scheduled arrival date, they will forfeit the total day use fee with no service fee charge.

No-Shows

  • Camping / Day Use: A camping no-show customer is one who does not arrive at a campground and does not cancel the reservation by check-out time on the day after the scheduled arrival date. Reserved campsites and group overnight facilities will be held until check-out time on the day following your scheduled arrival. Group day-use facilities will be held until check-in time on your scheduled arrival date.
  • If a customer does not arrive at the campground or group facility by check-out time the day after arrival or does not cancel the reservation by the times listed under "Late Cancellations" above, the customer may be assessed a $20.00 service fee and forfeit use fees.

Refunds

  • Customers must request refunds no later than 14 days after the scheduled departure date. Recreation.gov will not grant refund requests after 14 days of departure.
  • Reservation Fee: For some facilities, tours or permits an additional reservation fee is charged. For some overnight and day-use facilities, an additional non-refundable reservation fee may apply. The non-refundable reservation fee for tours and tickets is $1.00. The non-refundable reservation fee for permits varies by location.
  • Refunds for Bankcard Purchases: Refunds for bank card payments will be issued as a credit to the original bank card.
  • Refunds for Check or Cash Purchases: Refunds for Recreation.gov payments made by check or money order, and cash payments at selected campgrounds will be issued a check refund. A refund will be processed within 30 days of receipt and approval. Please Note: Refund requests made during or after departure can only be processed when approved by the facility management staff based upon local policy.
  • Refunds for Emergency Closures: In the event of an emergency closure, the Recreation.gov team will attempt to notify users and offer alternate dates (as appropriate). If this is not possible, reservations will be cancelled and all fees paid will be refunded. Reservation fees for free tickets are non-refundable in the event of an emergency closure.

Recreation.gov Billing Information

  • Reservation transaction will appear on customer's credit card statements as "Recreation.gov 877-444-6777."

Changes to Policies and Procedures

  • Recreation.gov reserves the right, when necessary, to modify reservation policies. These policies were last updated July 2018.

The facts

  • 232 bookable sites
  • 292 sites in total, including non-bookable
  • Vehicles up to 104 ft
  • Up to 100 people per site
  • Loops: A, B, C, E, F, G, GRP, Long Term, PAV1, S&P

Site types

  • 202 Standard Nonelectric
  • 60 Management
  • 21 Standard Electric
  • 6 Group Standard Nonelectric
  • 2 RV Electric
  • 1 Group Shelter Nonelectric

Amenities

  • Electric hookups
  • Water hookups
  • Sewer hookups
  • Campfires allowed
  • Fire pits
  • Picnic tables
  • Grills
  • Shade
  • Pets allowed

Book on Recreation.gov

292 campsites at Strawberry Bay

SiteLoopTypeEntrySurfaceMax rigPeople
A01AStandard NonelectricBack InPaved43 ft8 🐾
A02AStandard NonelectricPull ThroughPaved70 ft8 🐾
A03AStandard NonelectricBack InPaved48 ft8 🐾
A04AStandard NonelectricPull ThroughPaved70 ft16 🐾
A05AStandard NonelectricBack InPaved35 ft8 🐾
A06AStandard NonelectricBack InPaved45 ft16 🐾
A07AStandard NonelectricBack InPaved45 ft8 🐾
A08AStandard NonelectricBack InPaved45 ft8 🐾
A09AStandard NonelectricPull ThroughPaved70 ft8 🐾
A10AStandard NonelectricBack InPaved62 ft16 🐾
A11AStandard NonelectricPull ThroughPaved75 ft16 🐾
A12AStandard NonelectricBack InPaved43 ft8 🐾
A13AStandard NonelectricPull ThroughPaved70 ft16 🐾
A14AStandard NonelectricPull ThroughPaved70 ft16 🐾
A15AStandard NonelectricPull ThroughPaved70 ft8 🐾
A16 HOSTAManagementPull ThroughPaved93 ft16 🐾
A17AStandard NonelectricPull ThroughPaved75 ft16 🐾
A18AStandard NonelectricBack InPaved44 ft8 🐾
A19AStandard NonelectricBack InPaved45 ft16 🐾
A20AStandard NonelectricPull ThroughPaved70 ft8 🐾
A21AStandard NonelectricBack InPaved48 ft8 🐾
A22AStandard NonelectricBack InPaved50 ft8 🐾
A23AStandard NonelectricPull ThroughPaved65 ft8 🐾
A24AStandard NonelectricPull ThroughPaved75 ft16 🐾
A25AStandard NonelectricPull ThroughPaved60 ft8 🐾
A26AStandard NonelectricPull ThroughPaved80 ft16 🐾
A27AStandard NonelectricPull ThroughPaved65 ft8 🐾
A28AStandard NonelectricPull ThroughPaved75 ft8 🐾
A29AStandard NonelectricPull ThroughPaved65 ft8 🐾
A30AStandard NonelectricPull ThroughPaved65 ft8 🐾
A31AStandard NonelectricPull ThroughPaved60 ft8 🐾
A32AStandard NonelectricPull ThroughPaved70 ft8 🐾
A33AStandard NonelectricPull ThroughPaved65 ft8 🐾
A34AStandard NonelectricPull ThroughPaved65 ft8 🐾
A35AStandard NonelectricPull ThroughPaved70 ft8 🐾
A36AStandard NonelectricBack InPaved47 ft8 🐾
A37AStandard NonelectricBack InPaved48 ft8 🐾
A38AStandard NonelectricBack InPaved48 ft8 🐾
A39AStandard NonelectricBack InPaved54 ft16 🐾
A40AStandard NonelectricPull ThroughPaved60 ft8 🐾
A41AStandard NonelectricBack InPaved45 ft8 🐾
A42AStandard NonelectricBack InPaved52 ft8 🐾
A43AStandard NonelectricPull ThroughPaved60 ft8 🐾
A44AStandard NonelectricBack InPaved48 ft8 🐾
A45AStandard NonelectricBack InPaved42 ft8 🐾
B01 HOSTBManagementBack InPaved50 ft8 🐾
B02 HOSTBManagementBack InPaved50 ft8 🐾
B03BStandard ElectricBack InPaved42 ft8 🐾
B04BStandard ElectricBack InPaved59 ft8 🐾
B05BStandard ElectricBack InPaved46 ft8 🐾
B06BStandard ElectricBack InPaved43 ft8 🐾
B07BStandard ElectricBack InPaved48 ft8 🐾
B08BStandard ElectricPull ThroughPaved70 ft8 🐾
B09BStandard ElectricBack InPaved40 ft8 🐾
B10BStandard ElectricPull ThroughPaved65 ft8 🐾
B11BStandard ElectricPull ThroughPaved65 ft8 🐾
B12BStandard ElectricPull ThroughPaved65 ft8 🐾
B13BRv ElectricPull ThroughPaved60 ft8 🐾
B15BStandard ElectricPull ThroughPaved75 ft8 🐾
B16BStandard ElectricBack InPaved47 ft8 🐾
B17BStandard ElectricBack InPaved45 ft8 🐾
B18BStandard ElectricBack InPaved45 ft8 🐾
B19BStandard ElectricBack InPaved45 ft8 🐾
B20BStandard ElectricBack InPaved45 ft8 🐾
B21BStandard ElectricBack InPaved51 ft8 🐾
B22BStandard ElectricBack InPaved44 ft8 🐾
B23BStandard ElectricBack InPaved38 ft8 🐾
B24BStandard ElectricBack InPaved41 ft8 🐾
B25BStandard ElectricBack InPaved41 ft8 🐾
B26 HOSTBManagementBack InPaved53 ft8 🐾
B27BRv ElectricBack InPaved45 ft8 🐾
C01CStandard NonelectricBack InPaved50 ft8 🐾
C02CStandard NonelectricBack InPaved40 ft16 🐾
C03CStandard NonelectricPull ThroughPaved60 ft8 🐾
C04CStandard NonelectricPull ThroughPaved60 ft8 🐾
C05CStandard NonelectricPull ThroughPaved55 ft8 🐾
C06CStandard NonelectricBack InPaved48 ft8 🐾
C07CStandard NonelectricPull ThroughPaved55 ft8 🐾
C08CStandard NonelectricBack InPaved32 ft8 🐾
C09CStandard NonelectricPull ThroughPaved60 ft8 🐾
C10CStandard NonelectricPull ThroughPaved70 ft8 🐾
C11CStandard NonelectricPull ThroughPaved70 ft8 🐾
C12CStandard NonelectricBack InPaved51 ft8 🐾
C13CStandard NonelectricPull ThroughPaved60 ft8 🐾
C14CStandard NonelectricPull ThroughPaved65 ft8 🐾
C15CStandard NonelectricPull ThroughPaved60 ft8 🐾
C16CStandard NonelectricPull ThroughPaved55 ft8 🐾
C17CStandard NonelectricPull ThroughPaved55 ft8 🐾
C18CStandard NonelectricBack InPaved49 ft8 🐾
C19CStandard NonelectricBack InPaved52 ft8 🐾
C20CStandard NonelectricBack InPaved50 ft16 🐾
C21CStandard NonelectricBack InPaved44 ft8 🐾
C22CStandard NonelectricBack InPaved44 ft8 🐾
C23CStandard NonelectricBack InPaved44 ft8 🐾
C24CStandard NonelectricPull ThroughPaved55 ft8 🐾
C25CStandard NonelectricBack InPaved47 ft8 🐾
C26CStandard NonelectricPull ThroughPaved50 ft8 🐾
C27CStandard NonelectricBack InPaved45 ft8 🐾
C28CStandard NonelectricBack InPaved43 ft8 🐾
C29CStandard NonelectricBack InPaved43 ft8 🐾
C30CStandard NonelectricBack InPaved59 ft16 🐾
C31CStandard NonelectricBack InPaved25 ft8 🐾
C32CStandard NonelectricBack InPaved40 ft16 🐾
C33 HOSTCManagementBack InPaved40 ft16 🐾
C34CStandard NonelectricBack InPaved46 ft8 🐾
C35CStandard NonelectricPull ThroughPaved46 ft8 🐾
C36CStandard NonelectricBack InPaved40 ft8 🐾
C37CStandard NonelectricBack InPaved40 ft8 🐾
C38CStandard NonelectricBack InPaved40 ft8 🐾
E01EStandard NonelectricPull ThroughPaved60 ft8 🐾
E02EStandard NonelectricPull ThroughPaved50 ft8 🐾
E03EStandard NonelectricPull ThroughPaved60 ft8 🐾
E04EStandard NonelectricBack InPaved45 ft8 🐾
E05 HOSTEManagementBack InPaved—8 🐾
E06EStandard NonelectricPull ThroughPaved60 ft8 🐾
E07EStandard NonelectricPull ThroughPaved55 ft8 🐾
E08EStandard NonelectricBack InPaved45 ft8 🐾
E09EStandard NonelectricPull ThroughPaved60 ft8 🐾
E10 HOSTEManagementBack InPaved40 ft8 🐾
E11EStandard NonelectricBack InPaved45 ft8 🐾
E12 HOSTEManagementBack InPaved—8 🐾
E13EStandard NonelectricPull ThroughPaved65 ft16 🐾
E14EStandard NonelectricPull ThroughPaved60 ft8 🐾
E15EStandard NonelectricPull ThroughPaved60 ft8 🐾
E16EStandard NonelectricBack InPaved38 ft8 🐾
E17EStandard NonelectricBack InPaved48 ft8 🐾
E18EStandard NonelectricBack InPaved42 ft8 🐾
E19EStandard NonelectricBack InPaved38 ft8 🐾
E20EStandard NonelectricBack InPaved40 ft8 🐾
E21EStandard NonelectricBack InPaved55 ft8 🐾
F01FStandard NonelectricBack InPaved41 ft8 🐾
F02FStandard NonelectricBack InPaved26 ft8 🐾
F03FStandard NonelectricPull ThroughPaved60 ft8 🐾
F04FStandard NonelectricBack InPaved52 ft16 🐾
F05FStandard NonelectricPull ThroughPaved70 ft8 🐾
F06FStandard NonelectricPull ThroughPaved60 ft8 🐾
F07FStandard NonelectricBack InPaved31 ft8 🐾
F08FStandard NonelectricBack InPaved33 ft8 🐾
F09FStandard NonelectricBack InPaved45 ft8 🐾
F10FStandard NonelectricPull ThroughPaved60 ft8 🐾
F11FStandard NonelectricPull ThroughPaved60 ft8 🐾
F12FStandard NonelectricBack InPaved40 ft8 🐾
F13FStandard NonelectricPull ThroughPaved60 ft8 🐾
F14FStandard NonelectricBack InPaved43 ft8 🐾
F15FStandard NonelectricPull ThroughPaved60 ft8 🐾
F16FStandard NonelectricBack InPaved44 ft8 🐾
F17FStandard NonelectricBack InPaved46 ft8 🐾
F18FStandard NonelectricPull ThroughPaved60 ft8 🐾
F19 HOSTFManagementBack InPaved49 ft8 🐾
F20FStandard NonelectricPull ThroughPaved60 ft8 🐾
F21FStandard NonelectricPull ThroughPaved60 ft8 🐾
F22FStandard NonelectricBack InPaved31 ft8 🐾
F23FStandard NonelectricPull ThroughPaved65 ft8 🐾
F24FStandard NonelectricBack InPaved35 ft8 🐾
F25FStandard NonelectricBack InPaved34 ft8 🐾
F26FStandard NonelectricPull ThroughPaved60 ft8 🐾
F27FStandard NonelectricBack InPaved30 ft8 🐾
F28FStandard NonelectricBack InPaved30 ft8 🐾
F29FStandard NonelectricPull ThroughPaved60 ft16 🐾
F30FStandard NonelectricBack InPaved40 ft16 🐾
F31FStandard NonelectricBack InPaved33 ft8 🐾
F32FStandard NonelectricBack InPaved33 ft8 🐾
F33FStandard NonelectricBack InPaved38 ft8 🐾
F34FStandard NonelectricBack InPaved28 ft16 🐾
F36FStandard NonelectricBack InPaved32 ft8 🐾
F37FStandard NonelectricBack InPaved32 ft8 🐾
F38FStandard NonelectricBack InPaved42 ft16 🐾
F39FStandard NonelectricBack InPaved32 ft8 🐾
F40FStandard NonelectricBack InPaved42 ft8 🐾
F41FStandard NonelectricPull ThroughPaved50 ft8 🐾
F42FStandard NonelectricBack InPaved40 ft16 🐾
F43FStandard NonelectricBack InPaved40 ft8 🐾
F44FStandard NonelectricBack InPaved47 ft8 🐾
F45FStandard NonelectricBack InPaved43 ft8 🐾
F46FStandard NonelectricPull ThroughPaved60 ft8 🐾
F47FStandard NonelectricBack InPaved40 ft8 🐾
G01GStandard NonelectricBack InPaved37 ft8 🐾
G02GStandard NonelectricBack InPaved44 ft16 🐾
G03GStandard NonelectricPull ThroughPaved50 ft8 🐾
G04GStandard NonelectricBack InPaved37 ft8 🐾
G05GStandard NonelectricPull ThroughPaved50 ft8 🐾
G06GStandard NonelectricPull ThroughPaved60 ft8 🐾
G07GStandard NonelectricPull ThroughPaved60 ft8 🐾
G08GStandard NonelectricPull ThroughPaved60 ft8 🐾
G09GStandard NonelectricBack InPaved40 ft16 🐾
G10GStandard NonelectricBack InPaved38 ft8 🐾
G11GStandard NonelectricPull ThroughPaved60 ft8 🐾
G12GStandard NonelectricPull ThroughPaved60 ft8 🐾
G13GStandard NonelectricPull ThroughPaved60 ft8 🐾
G14GStandard NonelectricPull ThroughPaved60 ft16 🐾
G15GStandard NonelectricPull ThroughPaved60 ft16 🐾
G16GStandard NonelectricPull ThroughPaved50 ft16 🐾
G17GStandard NonelectricPull ThroughPaved55 ft8 🐾
G18GStandard NonelectricPull ThroughPaved55 ft8 🐾
G19GStandard NonelectricPull ThroughPaved50 ft8 🐾
G20GStandard NonelectricPull ThroughPaved54 ft8 🐾
G21GStandard NonelectricPull ThroughPaved65 ft16 🐾
G22GStandard NonelectricPull ThroughPaved56 ft8 🐾
G23GStandard NonelectricPull ThroughPaved60 ft8 🐾
G24GStandard NonelectricPull ThroughPaved55 ft8 🐾
G25GStandard NonelectricPull ThroughPaved50 ft8 🐾
G26GStandard NonelectricPull ThroughPaved62 ft16 🐾
G27GStandard NonelectricBack InPaved38 ft8 🐾
G28GStandard NonelectricBack InPaved36 ft8 🐾
G29GStandard NonelectricBack InPaved39 ft8 🐾
G30GStandard NonelectricBack InPaved36 ft8 🐾
G31GStandard NonelectricBack InPaved36 ft8 🐾
G32GStandard NonelectricBack InPaved38 ft8 🐾
G33GStandard NonelectricBack InPaved28 ft8 🐾
G34GStandard NonelectricBack InPaved39 ft8 🐾
G35GStandard NonelectricBack InPaved21 ft8 🐾
G36GStandard NonelectricBack InPaved34 ft8 🐾
G37GStandard NonelectricBack InPaved38 ft8 🐾
G38GStandard NonelectricBack InPaved40 ft8 🐾
G39 HOSTGManagementBack InPaved34 ft8 🐾
G40GStandard NonelectricBack InPaved40 ft8 🐾
G41GStandard NonelectricBack InPaved39 ft8 🐾
G42GStandard NonelectricBack InPaved44 ft8 🐾
G43GStandard NonelectricBack InPaved40 ft8 🐾
G44GStandard NonelectricBack InPaved39 ft8 🐾
G45GStandard NonelectricBack InPaved44 ft8 🐾
G46GStandard NonelectricBack InPaved34 ft8 🐾
G47GStandard NonelectricBack InPaved37 ft8 🐾
G48GStandard NonelectricBack InPaved34 ft16 🐾
G49GStandard NonelectricBack InPaved22 ft8 🐾
G50GStandard NonelectricPull ThroughPaved50 ft8 🐾
G51GStandard NonelectricPull ThroughPaved55 ft16 🐾
G52GStandard NonelectricBack InPaved42 ft8 🐾
G53GStandard NonelectricBack InPaved38 ft16 🐾
G54GStandard NonelectricBack InPaved49 ft8 🐾
G55GStandard NonelectricBack InPaved39 ft8 🐾
G56GStandard NonelectricBack InPaved47 ft8 🐾
G57GStandard NonelectricBack InPaved40 ft8 🐾
G58GStandard NonelectricPull ThroughPaved55 ft8 🐾
G59GStandard NonelectricBack InPaved42 ft16 🐾
GRP1GRPGroup Standard NonelectricBack InPaved40 ft80 🐾
GRP2GRPGroup Standard NonelectricBack InPaved40 ft80 🐾
GRP3GRPGroup Standard NonelectricPull ThroughPaved40 ft80 🐾
GRP4GRPGroup Standard NonelectricPull ThroughPaved40 ft80 🐾
GRP5GRPGroup Standard NonelectricPull ThroughPaved40 ft80 🐾
GRP6GRPGroup Standard NonelectricPull ThroughPaved40 ft80 🐾
D01Long TermManagementPull ThroughPaved99 ft8 🐾
D02Long TermManagementPull ThroughPaved99 ft8 🐾
D03Long TermManagementBack InPaved50 ft8 🐾
D04Long TermManagementPull ThroughPaved99 ft8 🐾
D05Long TermManagementBack InPaved46 ft8 🐾
D06Long TermManagementBack InPaved39 ft8 🐾
D07Long TermManagementBack InPaved39 ft8 🐾
D08 HOSTLong TermManagementBack InPaved51 ft16 🐾
D09Long TermManagementBack InPaved45 ft8 🐾
D10Long TermManagementPull ThroughPaved99 ft16 🐾
D11Long TermManagementBack InPaved47 ft16 🐾
D12Long TermManagementBack InPaved44 ft8 🐾
D13Long TermManagementBack InPaved41 ft8 🐾
D14Long TermManagementBack InPaved45 ft16 🐾
D15Long TermManagementBack InPaved52 ft8 🐾
D16Long TermManagementBack InPaved47 ft8 🐾
D17Long TermManagementBack InPaved47 ft8 🐾
D18Long TermManagementBack InPaved50 ft8 🐾
D19Long TermManagementBack InPaved52 ft8 🐾
D20 HOSTLong TermManagementPull ThroughPaved104 ft8 🐾
D21Long TermManagementBack InPaved62 ft8 🐾
D22Long TermManagementPull ThroughPaved99 ft8 🐾
D23Long TermManagementPull ThroughPaved99 ft8 🐾
D24Long TermManagementBack InPaved49 ft8 🐾
D25Long TermManagementBack InPaved41 ft8 🐾
D26Long TermManagementBack InPaved48 ft8 🐾
D27Long TermManagementBack InPaved44 ft8 🐾
D28Long TermManagementPull ThroughPaved99 ft8 🐾
D29Long TermManagementBack InPaved43 ft8 🐾
D30Long TermManagementBack InPaved46 ft8 🐾
D31Long TermManagementBack InPaved50 ft8 🐾
D32Long TermManagementBack InPaved51 ft8 🐾
D33Long TermManagementBack InPaved51 ft8 🐾
D34Long TermManagementBack InPaved38 ft8 🐾
D35Long TermManagementPull ThroughPaved99 ft8 🐾
D36Long TermManagementBack InPaved60 ft8 🐾
D37Long TermManagementBack InPaved44 ft8 🐾
D38Long TermManagementBack InPaved53 ft8 🐾
D39Long TermManagementBack InPaved44 ft8 🐾
D40Long TermManagementPull ThroughPaved96 ft8 🐾
D41Long TermManagementBack InPaved54 ft16 🐾
D42Long TermManagementPull ThroughPaved99 ft8 🐾
D43Long TermManagementBack InPaved46 ft8 🐾
D44Long TermManagementPull ThroughPaved99 ft8 🐾
D45Long TermManagementBack InPaved51 ft8 🐾
PV1PAV1Group Shelter NonelectricPull ThroughPaved40 ft100
DoubleS&PManagementBack InPaved62 ft16 🐾
Electric S&PS&PManagementPull ThroughPaved75 ft8 🐾
GroupS&PManagementBack InPaved40 ft80 🐾
PavilionS&PManagementPull ThroughPaved40 ft100
SingleS&PManagementBack InPaved43 ft8 🐾

Getting there

From Heber City, Utah, take Highway 40 east for 28 miles to Strawberry Bay Junction. Follow the signs for 6 miles to the campground.

40.17722, -111.17333 · 40°10'38.0"N 111°10'24.0"W

Directions (Google Maps) · Directions (Apple Maps)

Typical weather

JanFebMarAprMayJunJulAugSepOctNovDec
High °F————————————
Low °F————————————
Precip in3.73.32.62.41.91.21.11.62.02.42.73.5

1991–2020 averages from the nearest NOAA station, 2.3 mi away — not measured at the facility itself, and elevation can make a real difference over that distance.

Map

Fees and stay limits

Cash, Check, or Scan & Pay 232 single sites - $42.00, capacity - 8 people, 1 vehicle  26 single full hook-up sites - $54.00, capacity - 8 people, 1 vehicle 25 double sites - $82.00, capacity - 16 people, 2 vehicles 6 group sites - $275.00, capacity - 80 people , 10 vehicles 1 group site pavilion - for overnight - $413.00, capacity -100, can accommodate up to 15 RVs.  Day use at fishing access parking - $15.00 Extra Vehicle - $10.00 per vehicle (paid on-site cash/check) Firewood - $9.00 *Camp fee's include boat launch and dump station  Stawberry Reservoir and Currant Creek Reservoir Season Day Use Pass - $122* *This pass includes Day Use and Boat Launch. Pass does NOT include access to group sites, amphitheaters, or glamping sites.

From Recreation.gov, which is not always current. The operator's own page is the authority on what you will be charged.

More photos

Member photos

Common questions about Strawberry Bay

Can you reserve a site at Strawberry Bay?
Yes, Strawberry Bay is reservable through Recreation.gov.
How many campsites does Strawberry Bay have?
292 sites in total, of which 232 can be booked.
What is the maximum RV length at Strawberry Bay?
104 ft. That is the longest vehicle the sites here are recorded as taking; individual sites may be shorter.
Are pets allowed at Strawberry Bay?
Yes, pets are allowed at Strawberry Bay.
Does Strawberry Bay have hookups?
Electric, Water, Sewer.
Are campfires allowed at Strawberry Bay?
Campfires are allowed at Strawberry Bay. Check for a current fire restriction before you go.

Also listed by

Strawberry Bay also appears in other federal recreation data. Facts below are matched by name and location, not confirmed by Strawberry Bay's operator.

USDA Forest Service — data as of Aug 24, 2026

    Restrictions:

    • No ATVs or OHVs in campground. Pets must be leashed. Quiet hours are from 10PM to 6AM. No discharge of firearms or fireworks. This campground requires a 2 day minimum stay on weekends and a 3 day minimum stay on holiday weekends.

    USDA Forest Service's own page

    Camping near Strawberry Bay

    Comments

    Contact

    Recreation.gov last updated this record on 2026-08-11.

    Facility information and photographs from Recreation.gov (RIDB). SpotOpened is not affiliated with Recreation.gov or any federal agency.